WhatsApp (305) 321-5353 Call now

Mon–Sat 8 AM–6 PM · Free estimates · Se habla español

Flooring service

Floor removal and subfloor preparation

Every great floor starts underneath. We tear out old flooring, remove adhesive, fix low spots and test moisture so your new floor goes down flat, bonds properly and lasts.

Clean tear-out

Carpet, carpet tile, vinyl, VCT, laminate and wood removed and hauled off.

Flat, sound substrate

Patching and self-leveling to manufacturer tolerances.

Moisture tested

Slabs checked before adhesives or wood go down.

Protects your warranty

Most flooring warranties depend on proper prep.

Why prep matters

Most flooring failures — peaking LVP, hollow spots, popped tiles, failed adhesive — trace back to the substrate. Manufacturers specify how flat and dry the floor must be. We meet those specs before a single plank goes down.

From airport terminals to living rooms

At Miami International Airport we removed worn carpet tile and prepared concourse substrates before installing new carpet. At home it might mean leveling an old slab or filling grout lines so LVP can float over tile. Same standard, every time.

FAQ

Removal & Prep questions

Can you install over my existing floor instead of removing it?

Sometimes. Flat, well-bonded tile can often stay in place under LVP or laminate. Carpet, loose vinyl and damaged floors need to come out. We’ll recommend the most cost-effective option during your estimate.

What is self-leveling compound?

A cement-based underlayment poured over the floor to fill dips and create a flat surface for new flooring. It’s often required for LVP, LVT and engineered wood.

Why test concrete for moisture?

Excess moisture can break down adhesives and make flooring cup, bubble or grow mold. Testing first lets us choose the right adhesive, barrier or mitigation.

Get your free removal & prep estimate

Send us a photo of your space on WhatsApp — we’ll reply with next steps and a free estimate.

Free estimate